ONGOING PROJECT – REDA ELITE 242
REDA ELITE 242
REDA ELITE 242 is a Premium Three Bed Room Residential Apartment of total sixteen units.
LOCATION :
East Main Road, Anna Nagar, Chennai – 600101
Project Type : Premium Residential Apartment
Location : East Main Road, Anna Nagar, Chennai – 600101.
Accommodation : 3 Bedroom Units
Total No of Units : 16 Numbers
No. of Floors : Stilt + 4
Project Status : Yet to Launch
STRUCTURE
R.C.C. framed structure with RCC Columns, beams and slabs. Brick Masonry filler walls, Stilt plus Four Floors with earth quake resistant design.
JOINERY
MAIN DOOR
First Class Teak Wood both frame and shutter with varnish grade.
OTHER DOORS
1. Frames in first class Teak Wood.
2. Shutters solid core flush door with Varnish grade.
WINDOWS
UPVC windows for all External Openings.
FLOORING
Vitrified Tile Flooring (2 x 2) from RAK or Equivalent.
KITCHEN
Black Granite slab over cooking platform, carysil kitchen sink and ceramic tile dado about 2′-0″ height above platform.
TOILETS
Ceramic tile flooring from RAK or Equalant and tile Dado, For walls with RAK or Equalant Tiles full Height From Floor to False Ceiling, Concealed Plumbing Arrangements For All Toilets (Finolex PVC pipes for cold water and CPVC pipes for hot water lines)
SANITARYWARES & FIXTURES
White Glazed EWC and white colour Wash Basin, C.P. fittings and other suitable fixtures from Jaquar or Equivalent.
WATER SUPPLY
One Sump and Overhead Tank for Metro Water. Taps in the kitchen for Metro water and Ground Water (bore well). Toilets shall have 1 No. concealed Diverter/ wall mixer and a Health faucet.
ELECTRICAL
Three phase electric supply connection with changeover facility and concealed copper wiring from Havels. All switches from MK / Anhor Roma points for telephone, T.V, Fridge, Geyser, Washing Machine, Grinder, Fan and Light points. Miniature Circuit Breaker & ELCB (Earth Leak Circuit Breaker) from Havels
FINISHING
Internal walls finishing with premium ICI / Asian / emulsion over Two coats of cement putty & External walls finishing with weather proof exterior emulsion from ICI Weather shield MAX.
LOFTS
Open Lofts in Bedrooms and Kitchen.
PROVISION OF ELECTRICAL POINTS
ENTRANCE : One Bell Point and One Light Point
DRAWING : One TV Point, One Telephone Point, 2 light points in walls and one chandelier point. One 5 Amps pint point and one Fan point and One 20 Amps point for split A/c Provision.
DINING : One 15 Amps points for fridge, Two light points in wall, One 5 Amps pin point and One Fan point.
BEDROOMS : 2 light points in wall, One 5Ams pin point, one 20 Amps point for Split AC, and one Fan point and One Telephone point.
Note: All AC points are for split AC provisiononly. Window AC provision will be charged.
KITCHEN : Two light points in wall, Exhaust fan point, one pin point for Mixie, one point for Wet-grinder and 5Ams point for Aqua Guard.
TOILETS : One light point, one 15 Amps point for Geyser, One light point over wash basin mirror and one One 5 Amps Exhaust fan point.
SERVICE : One 5 Amps pin point and one light point and 15 Amps point for Washing Machine.
COMMON POINTS : Common light points in stairs, Terrace 2 Nos in Parapet walls, points for pump motor etc., all as per Company’s design.
Electrical points required over and above the standard provisions will be provided at extra cost.
1. Security Cabin
2. CCTV.
3. Generator for complete Power Back Up except A/c.
4. Lift with capacity of 8 persons.
5. Beautiful landscaping with Terrace Party Area.
6. Gym Room with Equipment.
7. Biometric system in entrance lobby for accessing apartment.
8. Guest Room.
8. Compound walls and Entrance Gates as per Architect’s Design.
9. Common area staircase Vitrified Tiles / Granite flooring.
10. Name plates, Letter Box for each flats.
11.Separate electric meters in the main board, separate common electric meter for common service and sub main board (ECB) in each flat for quick isolation of supply.
Stamp Duty & Registration charges |
7% of the value of undivided share of land as stamp duty and 4% of the value of land as registration charges will have to be borne by the Purchaser. Stamp Duty and registration charges will have to be paid based on Seller’s value or the guide line value whichever is higher. |
1 % OF THE VALUE OF THE CONSTRUCTION Agreement as stamp duty and 1 % as registration charge. |
Legal fees, Documentation charges and incidental charges payable at Registrar Office will have to be borne by the Allottee. |
GST is applicable. |
SERVICE CONNECTION
ELECTRICITY
Meter Deposit and Development charges will have to be borne by the Allottee. The fees payable to TNEB will be including incidental expenses towards electrical connection will have to be paid by the Party on Pro-Rata basis.
WATER CONNECTION & DRAINAGE CONNECTION
Fees for Metro Water connection, Drainage Connection and incidental expenses have to be borne by the Allottee.
Extra Work |
If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pays the extra cost in Advance. |
Level |
Payment Percentage |
|
While booking |
: |
15% |
On Completion of Foundation |
: |
15% |
On completion of Ground/Stilt Floor Roof slabs |
: |
15% |
On Completion of First Floor Roof Slab |
: |
10% |
On Completion of Second Floor Roof Slab |
: |
10% |
On Completion of Third Floor Roof Slab |
: |
10% |
On Completion of Fourth Floor Roof Slab |
: |
10% |
On Completion of Brick work in Respective Unit |
: |
10% |
On handing over |
: |
5% |
unit |
||
First Floor |
Flat Area |
Status |
101 |
1275sq.ft |
|
102 |
1276sq.ft |
|
103 |
1305sq.ft |
|
104 |
1299sq.ft |
|
Second Floor |
Flat Area |
Status |
201 |
1275sq.ft |
|
202 |
1276sq.ft |
|
203 |
1305sq.ft |
|
204 |
1299sq.ft |
|
Third Floor |
Flat Area |
Status |
301 |
1275sq.ft |
|
302 |
1276sq.ft |
|
303 |
1305sq.ft |
|
304 |
1299sq.ft |
|
Fourth Floor |
Flat Area |
Status |
401 |
1275sq.ft |
|
402 |
1276sq.ft |
|
403 |
1305sq.ft |
|
404 |
1299sq.ft |
|